Communications network audit

Let’s put your network in perfect order!

Result

Let’s put your network in perfect order!

When applied

After analysis of customer requirements and a site survey.

Work scope (stages)

Communications Network Audit

We audit fiber-optic networks and structured cabling systems to identify bottlenecks, bring order to the infrastructure, and prepare the network for modernization.

MOSCOS provides a comprehensive audit of communications networks: fiber-optic lines (FOL) and structured cabling systems (SCS). We verify compliance with applicable standards, document the current state of the network, and identify issues in connections, routes, and labeling. Based on the results, we prepare a conclusion and recommendations to improve performance and optimize the use of network resources.

Our audit scope

  • Fiber-optic network audit: diagnostics of optical lines and evaluation of data transmission parameters.
  • SCS audit: verification of SCS components, cable routes, outlets, and connections against required standards.
  • Infrastructure inventory: documentation of network elements, nodes, and connections for effective management.
  • Reporting and recommendations: preparation of a condition report and practical improvement roadmap.

What we do

  • Inspect cross-connect equipment: check cross-connects and patch panels, identify connection and switching issues.
  • Perform OTDR testing: test optical fibers to detect losses and potential damage points.
  • Measure insertion loss: evaluate loss levels in optical fibers that impact transmission quality.
  • Create cable паспортизация: produce documentation of fiber-optic cable characteristics and condition.
  • Apply labeling: label cross-connects, panels, ports, outlets, and cables for easier operation and maintenance.
  • Test the SCS: diagnose routes, connections, and outlets for compliance with standards and requirements.
  • Prepare the conclusion: deliver a report on the condition of the fiber-optic network and SCS with recommendations.

Value for the client

  • Clear network visibility: the current condition of the fiber-optic network and SCS is documented, with problem areas identified.
  • Order in the infrastructure: labeling completed and documentation prepared for management and maintenance.
  • Improvement plan: recommendations for optimization, modernization, and increased network efficiency.
  • Decision-ready basis: conclusions and measurement results suitable for planning work scope and budget.

Who this is for

  • Network operations: when you need to bring order and simplify maintenance of fiber-optic networks and SCS.
  • Before modernization: when preparing for expansion, node relocation, or infrastructure changes.
  • When connectivity issues arise: if losses, instability, or suspected route defects are observed.
  • When changing contractors: to document the network condition and obtain an independent assessment.
  • For network acquisition or sale: to document the condition of communication lines and receive an independent audit of fiber-optic networks and SCS.

Why MOSCOS

  • Comprehensive audit: both fiber-optic networks and SCS, including measurements, labeling, and documentation.
  • Engineering diagnostics: OTDR testing and loss measurements for objective evaluation.
  • Documented outcomes: cable паспортизация and a formal condition report.
  • Practical recommendations: actionable steps to improve and optimize network resource utilization.

MOSCOS delivers audits of fiber-optic networks and structured cabling systems with measurements, labeling, and a final report to support infrastructure management and development.

Contact us for a consultation. Phone: +7 (495) 215-57-01

What is required from customer

Source data, site constraints, target requirements and available design documentation.

What customer receives (artifacts)

Reporting, as-built and closing documentation within the contract scope.

Limitations and risks

Site access, source-data completeness, approvals, schedule and third-party requirements.