DESIGNING A RELIABLE FUTURE.

Glossary

MOSCOS Engineering Definitions

This page provides stable term definitions for services, cases, documents and SLA processes.

Fiber Optic Communication Line

Definition: Fiber optic communication line. Engineering data transmission infrastructure based on optical cable.

Scope: Used in backbone, urban and site-level communication networks.

Related pages: services, cases, documents.

Service Level Agreement

Definition: Service Level Agreement. Defines support, response and responsibility parameters.

Scope: Used in support and operation service contracts.

Related pages: services, cases, documents.

Acceptance

Definition: A stage of confirming work results against agreed criteria and documents.

Scope: Applied at final stages of services and project cases.

Related pages: services, cases, documents.

Project Artifacts

Definition: A set of output materials: as-built documents, reports, acts and supporting files.

Scope: Used as mandatory output of an engineering operation.

Related pages: services, cases, documents.

Incident

Definition: An event that disrupts normal infrastructure operation and requires regulated response.

Scope: Used in support and SLA processes.

Related pages: services, cases, documents.

Engineering Survey

Definition: Collection of source data on site before design and implementation.

Scope: Used at the service preparation stage.

Related pages: services, cases, documents.

Telecom Duct Infrastructure

Definition: Underground linear infrastructure of ducts and access chambers used to install and operate communication cables.

Scope: Designed and built by open-cut methods with individual crossings installed by HDD where required.

Related pages: services, cases, documents.

Horizontal Directional Drilling

Definition: Horizontal directional drilling. A trenchless method for constructing an underground crossing along a designed bore path.

Scope: Used on route sections where open trench excavation is constrained or technically unsuitable.

Related pages: services, cases, documents.

Mosgorgeotrest Technical Conclusion

Definition: The result of verifying design documentation against the Moscow Consolidated Plan of Underground Utilities and Facilities.

Scope: Part of the permitting process for underground utility networks and facilities.

Related pages: services, cases, documents.

OATI Earthworks Order

Definition: An order authorizing earthworks, temporary fencing and temporary facilities where required by Moscow rules.

Scope: Obtained after preparing the design and the approvals and documents applicable to the project.

Related pages: services, cases, documents.

Project Constraints

Definition: Factors affecting timeline, technology, access and work scope.

Scope: Recorded in service cards, cases and contractual documentation.

Related pages: services, cases, documents.

Request a Quote

Definition: Formal project entry: task parameters, contacts and initial constraints.

Scope: Used as initial step before survey and scope agreement.

Related pages: services, cases, documents.

Ready to estimate the project?